How to Build a Concrete Base for Your Garden Sauna

Complete Foundation Guide • Updated February 2026
Concrete foundation construction in progress

A sauna base needs to handle 800-1,200kg load, stay level for 20+ years, and drain properly. Here's exactly how I built mine for £265 over 5 days - photos included.

Quick Summary: Remove turf, dig out soil, lay 50mm Type 1 hardcore (compacted), DPM membrane, rebar, then pour 100mm concrete slab. Hand-mixing is cheaper and more controllable than ready-mix. Leave to cure for a few weeks. Total cost: £200-300 for a 2.4m x 2.1m base, plus skip hire for soil removal.

Before You Start: Calculate your finished floor level first. Work backwards from where you want the sauna floor to sit - ideally aligned with any external patio so it all flows nicely. Getting this wrong is expensive to fix later.

Why Concrete? (Alternative Options)

Option Cost Pros Cons
Concrete Slab £200-300 Permanent, level, solid Hard work, permanent
Paving Slabs £150-250 Easier, removable Can shift, joints
Deck Platform £300-500 Raised, drainage More expensive, needs treating
Gravel £80-120 Cheap, drains well Not level enough, shifts

I chose concrete because: Once done, it's done. Level stays level. No maintenance. Proper job.

What You'll Need

Materials (for 2.4m x 2.1m base = 5m²)

Item Quantity Cost
MOT Type 1 hardcore 0.5 tonne £35
Ballast (sand/gravel mix) 1 tonne £65
Cement (25kg bags) 10 bags £50
Rebar (steel reinforcement) ~20m £40
DPM (plastic damp proof membrane) 6m² £18
Formwork timber (18x100mm) 10m £25
Stakes for formwork 8 pieces £12
Screws, pegs, misc - £20
Total Materials £265

Additional Costs to Budget For

Item Notes Cost
Skip hire (4-yard) For soil removal - I filled half of it £200-280
Whacker plate hire 1 day - for compacting Type 1 £40
Cement mixer hire 2 days - essential for hand-mixing £70
Labourer (optional but recommended) Digging and barrowing is brutal work £100/day

Hiring help: I paid a labourer £100/day for the heavy digging. At my age, this felt like excellent value. The digging, barrowing soil to the skip, and mixing concrete is genuinely hard physical work - don't underestimate it.

Tools Required

The Build Process

Step 1: Mark Out & Excavate (1-2 days)

Check for services first:

If your sauna is near the house, check for underground cables and pipes before digging. Call utility companies for plans, or hire a CAT scanner. My sauna was at the back of the garden, well away from the house, so I was confident there was nothing there - but I still dug carefully.

Mark your area:

  1. Measure your sauna dimensions (e.g., 2.4m x 2.1m)
  2. Add 100mm all around (base = 2.6m x 2.3m)
  3. Use string lines and corner pegs to mark rectangle
  4. Check diagonals are equal (confirms square)

Calculate your finished level:

This is crucial. Work backwards from where you want the sauna floor to end up. If you're matching an existing patio level, measure down from there. My sauna floor is tiled to match the external patio, so everything flows together nicely.

Remove the turf:

Dig out the soil:

Soil removal is brutal: I filled half a 4-yard skip with soil. Couldn't get a mini dumper round the side of the house, so every load went by wheelbarrow. This is where a labourer earns their money. Budget £200-280 for skip hire.

Ground conditions matter:

My experience: The sauna was at the back of the garden on grass. Ground was sandy with lots of roots to dig out. Took about 2 days with a labourer helping. We did it in autumn when the ground was soft - much easier than summer-baked earth.

Step 2: Type 1 Sub-Base (Half day)

Hardcore base and insulation layer

Order MOT Type 1:

Laying the sub-base:

  1. Tip Type 1 into excavated area
  2. Spread evenly with rake - 50mm depth is sufficient
  3. Compact thoroughly with whacker plate (hire from HSS/Jewson, £40/day)
  4. Check level - should be flat and solid
  5. Add more in low spots, compact again

Compaction test: Walk on it. Should feel rock-solid with no give whatsoever. If it moves at all, compact more.

Honest assessment: With sandy ground like mine and a hefty reinforced concrete slab going on top, the Type 1 layer was probably overkill. On clay soil or with a thinner slab, it's more important. I did it anyway - belt and braces approach - but you could argue it's not essential if your soil is stable and your slab is properly reinforced.

Step 3: DPM & Formwork (1 hour)

Lay damp-proof membrane:

  1. Roll 1200g DPM (heavy duty) over hardcore
  2. Overlap sheets by 300mm minimum
  3. Run up sides 100mm
  4. No need to seal overlaps (concrete weight holds)

Don't skip DPM! Concrete is porous. Without DPM, ground moisture will wick up into your sauna base = rot. £18 membrane protects £4,000 sauna.

Build formwork:

  1. Cut 18x100mm boards to perimeter lengths
  2. Set boards on edge around perimeter (tops level)
  3. Drive stakes outside boards every 600mm
  4. Screw stakes to boards
  5. Check tops are level (use laser or long spirit level)
  6. Backfill outside stakes with soil (holds firm)

Getting level correct:

Step 4: Concrete Pour (1 day)

Option A: Hand-Mix (What I Did - Recommended)

Option B: Ready-Mix Delivery

Why I chose hand-mixing: Ready-mix can get really messy if you're not set up for it. With hand-mixing, you control the pace - mix a batch, pour it, spread it, repeat. No stress about the concrete going off before you're ready. Hire a cement mixer (£35/day) - don't try to mix by hand in a wheelbarrow, you'll regret it.

Pouring process:

  1. Lay rebar on the DPM (use 50mm spacers or bricks to lift it off the membrane - you want the steel in the middle of the slab, not at the bottom)
  2. Mix concrete in batches - not too wet, should hold its shape
  3. Pour into formwork, starting at far corner
  4. Spread evenly with rake (aim for just above formwork level)
  5. Tamp down with timber beam to remove air pockets
  6. Strike off level with formwork using a straight timber bar - drag it across the top of the formwork to screed off excess
  7. Smooth surface with steel trowel or float

Finishing:

Weather: Do this when it's not raining. We did it in autumn - ground was soft, air was cool, perfect conditions. Avoid pouring in heavy rain or extreme heat.

Step 5: Curing (2-4 weeks)

First 24-48 hours:

Days 2-7:

Full cure: 28 days

Concrete continues hardening for weeks. At 7 days it's about 70% strength. At 28 days it's 100%.

My approach: I left it for a few weeks before building. No rush - it was autumn, and I wanted it properly cured. The sauna isn't going anywhere, so there's no benefit to rushing onto a green slab.

Anchoring the Sauna Frame

Once cured, you'll anchor your timber base frame to the concrete.

Options:

Honest opinion: I used anchor bolts to fix the frame to the slab. With hindsight, this felt a little pointless - the finished sauna is so heavy it's not going anywhere. I did it for peace of mind and because it felt like the "proper" thing to do, but it's probably not strictly necessary.

Floor Finish Options

Your concrete slab is just the base - you'll need a finished floor surface inside the sauna.

Option 1: Tiles (What I Did)

I tiled the sauna floor using the same tiles as the external patio, so it all flows together visually. This works brilliantly - looks intentional and high-end.

Option 2: Wooden Duck Boards

Slatted wooden panels that sit on the concrete. Common in traditional saunas.

Option 3: Sealed Concrete

Just seal the concrete with waterproof paint/sealer.

Pro Tip: Granite Skirting Upstand

This is something I did that I've never seen mentioned in other guides, and it works brilliantly.

Around the base of the interior walls, I installed 100x100mm granite tiles (20mm thick) as a skirting upstand. These sit on top of the floor tiles and protect the bottom of the wooden wall cladding from water splash and damp.

Why it matters: The bottom edge of interior panelling is most vulnerable to moisture damage. Water pools on floors, splashes during löyly, and humidity is highest at floor level. The granite upstand acts as a permanent barrier - water can't wick up into the wood.

Cost: About £50-80 for enough granite tiles. Cheap insurance for protecting expensive thermo-treated interior panelling.

Drainage Considerations

Concrete slab needs to handle water runoff from sauna and surrounding area.

Option 1: Slight Fall (What I Did)

Option 2: Perimeter Drainage

Option 3: Perfectly Level

Common Mistakes to Avoid

1. Skipping Hardcore

Problem: Concrete poured straight onto soil will crack and sink.

Solution: Always use 100mm compacted hardcore first.

2. Poor Compaction

Problem: Soft hardcore = sinking concrete = unlevel sauna.

Solution: Hire proper whacker plate, compact thoroughly, test by walking on it.

3. No DPM

Problem: Moisture wicks through concrete into timber base = rot within 5 years.

Solution: Always use 1200g DPM under slab. £18 insurance policy.

4. Insufficient Concrete Thickness

Problem: 50-75mm slab will crack under sauna weight.

Solution: Minimum 100mm thick. 120mm if heavy materials.

5. Poor Leveling

Problem: Wonky base = wonky sauna = doors don't close properly.

Solution: Use laser level. Check level constantly. Aim for ±3mm max.

6. Rushing the Cure

Problem: Building on wet concrete = cracked slab.

Solution: Wait minimum 7 days. Check it's dry (not dark/damp looking).

Cost-Saving Tips

1. Order Concrete with Neighbours

Minimum delivery is 1m³ (you need 0.5m³). Share with neighbour doing patio/path. Saves delivery charge.

2. Reuse Formwork Timber

After curing, use same timber for sauna frame/base. Saves £25.

3. Skip Reinforcement Mesh

For small saunas on good ground, 100mm concrete without mesh is adequate. Saves £35. I used mesh anyway (belt & braces).

4. Collect Hardcore Yourself

Some recycling centres sell MOT Type 1 for £15/tonne (you collect). Saves £20 delivery.

5. Hand-Mix in Batches

If no truck access and happy to work over 2-3 evenings, hire mixer and do it yourself. Saves £40 vs ready-mix. Hard graft though.

FAQs

Do I need building regulations approval?

No. Sauna bases/foundations don't require Building Control approval. Just do a proper job.

How thick should the concrete be?

100mm minimum for garden saunas. 120mm if using heavy materials or poor ground.

Can I use paving slabs instead?

Yes, but harder to get perfectly level. Lay on 50mm sharp sand, use string lines, check constantly with level. Joints between slabs can cause issues.

What if my ground is clay/soft?

Increase hardcore to 150mm, compact extra-thoroughly. Consider geotextile membrane under hardcore.

Do I need reinforcement mesh?

Not essential for small saunas on good ground, but recommended. A142 mesh costs £35 and adds significant strength.

Can I pour in winter?

Avoid if below 5°C. Concrete won't cure properly. Wait for milder weather or use rapid-hardening concrete (£10 extra per m³).

How level does it need to be?

Within 3mm across entire base. Use laser level (£30). Critical for door fitting later.

What if I make it wonky?

For minor issues (<10mm), use packers/shims under sauna frame. For major issues (>20mm), you'll need to re-do it or build timber sleepers to level.

My Build: Timeline & Costs

The whole foundation took about 5 days of actual work, spread over several weeks (no rush on curing).

Day 1-2: Excavation

Day 3: Sub-base

Day 4: Concrete

Day 5+: Curing

Weather note: We did this in autumn. Ground was soft (easier to dig), weather was cool (concrete cures better), and dry enough not to worry about rain. Would have been much harder in summer with baked earth, or in winter with frost risk.

Total active work: ~5 days

Total cost: ~£265 materials + £200-280 skip + £100-200 labourer = £565-745

Is It Worth DIY?

Professional groundworker would charge:

DIY saves: £300-600

Even with hiring a labourer to help, DIY is significantly cheaper. And you know it's done properly because you did it yourself.

Bottom Line

A proper concrete base is THE foundation of a long-lasting sauna. Rush it or do it badly = problems for years.

Take your time, get it level, use proper materials. Two days of work now = zero issues for 20+ years.

My base is 18 months old. Still perfectly level, no cracks, no issues. Best £265 and 10 hours I spent on the entire build.

Ready to Build?

Get complete construction plans with detailed foundation specs at saunaplans.co

← Back to Home